Generating units
| Unit | Name | Capacity MW | Ramp MW/interval | Reserve MW | Cost | State | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P min | P max | Up | Down | Up | Down | Freq | Start-up ₪ | Min-load ₪/h | Must-run | Available | Initial | ||
Offers by unit
| Unit | Fuel | Bands | Offered MW |
|---|
Offer stack
₪/MWh against cumulative MW
Demand profileMW
Requirements
| Reserve up | 50 | MW | example |
| Reserve down | 50 | MW | example |
| Frequency | 25 | MW | example |
| Gas limit | — | MW | default |
| Coal last | yes | default |
Shortage prices
| VOLL | 10,000 | ₪/MWh | example |
| Shortage fraction | 5 | % | default |
| Reserve shortage | 100,000 | ₪/MWh | default |
Engine settings
| Interval length | 30 | min | default |
Not modelled
| Where | Min up time intervals | Min down time intervals | Heat rate MMBTU/MWh | Variable O&M ₪/MWh |
|---|---|---|---|---|
| CCGT_1 | 4 | 4 | 7.0 | 2.0 |
| CCGT_2 | 4 | 4 | 7.2 | 2.0 |
| CCGT_3 | 3 | 3 | 7.5 | 2.5 |
| SC_1 | — | — | 9.5 | 3.0 |
| SC_2 | — | — | 10.0 | 3.5 |
| COAL_1 | 12 | 12 | 9.8 | 4.0 |
| COAL_2 | 12 | 12 | 10.0 | 4.0 |