Basic Merit Order
Gas units are dispatched cheapest-first to meet 210 MW. The price is set by the marginal unit, the cheapest one still holding spare capacity to serve the next megawatt, even though cheaper units are also running.
Generation Units Table
Pre-optimization unit parameters
| Unit | Fuel | Technology | Capacity (MW) |
Min Load (MW) |
Ramp (MW/min) |
Spin Res (MW) |
Freq Res (MW) |
Price (NIS/MWh) |
|---|---|---|---|---|---|---|---|---|
| GAS_1 | GAS | CCGT | 100 | 30 | 1.67 | 0 | 0 | 100 |
| GAS_2 | GAS | CCGT | 80 | 25 | 1.67 | 0 | 0 | 150 |
| GAS_3 | GAS | SIMPLE_CYCLE | 70 | 20 | 1.67 | 0 | 0 | 200 |
| GAS_4 | GAS | SIMPLE_CYCLE | 60 | 20 | 1.67 | 0 | 0 | 250 |
| GAS_5 | GAS | SIMPLE_CYCLE | 50 | 20 | 1.67 | 0 | 0 | 300 |
System Parameters
Time Horizon
1 intervals (0.5h)
Interval Duration
30 minutes
Spinning Reserve (Up)
0 MW
Spinning Reserve (Down)
0 MW
Frequency Reserve
0 MW
Value of Lost Load
100000 NIS/MWh
Coal Priority
Dispatched Last
Demand
Total Demand
210 MW
Running Optimization
✓ Initializing solver...
○ Unit commitment (MILP)...
○ MCP extraction (LP)...