Min Up/Down Time
Once started, the baseload unit must run for 3 intervals. Even when demand drops, it cannot shut down. Commitment decisions have multi-interval consequences.
Generation Units Table
Pre-optimization unit parameters
| Unit | Fuel | Technology | Capacity (MW) |
Min Load (MW) |
Ramp (MW/min) |
Spin Res (MW) |
Freq Res (MW) |
Price (NIS/MWh) |
|---|---|---|---|---|---|---|---|---|
| GAS_1 | GAS | CCGT | 120 | 40 | 2.0 | 0 | 0 | 100 |
| GAS_2 | GAS | SIMPLE_CYCLE | 60 | 20 | 2.0 | 0 | 0 | 250 |
System Parameters
Time Horizon
4 intervals (2.0h)
Interval Duration
30 minutes
Spinning Reserve (Up)
0 MW
Spinning Reserve (Down)
0 MW
Frequency Reserve
0 MW
Value of Lost Load
100000 NIS/MWh
Coal Priority
Dispatched Last
Demand Profile