Merit Order with Reserves
A standard merit order, now with spinning and frequency reserve requirements. Holding reserve locks part of a unit's capacity, so the cheapest running unit no longer sets the price.
Generation Units Table
Pre-optimization unit parameters
| Unit | Fuel | Technology | Capacity (MW) |
Min Load (MW) |
Ramp (MW/min) |
Spin Res (MW) |
Freq Res (MW) |
Price (NIS/MWh) |
|---|---|---|---|---|---|---|---|---|
| GAS_1 | GAS | CCGT | 250 | 200 | 333.3 | 40 | 40 | 150 |
| GAS_2 | GAS | CCGT | 100 | 70 | 333.3 | 20 | 20 | 170 |
| GAS_3 | GAS | CCGT | 150 | 100 | 333.3 | 40 | 0 | 180 |
| GAS_4 | GAS | CCGT | 120 | 80 | 333.3 | 40 | 0 | 250 |
System Parameters
Time Horizon
1 intervals (0.5h)
Interval Duration
30 minutes
Spinning Reserve (Up)
100 MW
Spinning Reserve (Down)
100 MW
Frequency Reserve
60 MW
Value of Lost Load
100000 NIS/MWh
Coal Priority
Dispatched Last
Demand
Total Demand
480 MW
Running Optimization
✓ Initializing solver...
○ Unit commitment (MILP)...
○ MCP extraction (LP)...