Generation Units Table
Pre-optimization unit parameters
Unit Fuel Technology Capacity
(MW)
Min Load
(MW)
Ramp
(MW/min)
Spin Res
(MW)
Freq Res
(MW)
Price
(NIS/MWh)
GAS_1 GAS CCGT 250 200 0.3 40 30 150
GAS_2 GAS CCGT 100 70 2.0 20 20 170
GAS_3 GAS CCGT 150 100 1.0 40 30 180
COAL_1 COAL STEAM 400 320 5.0 0 0 190
GAS_5 GAS SIMPLE_CYCLE 120 80 3.0 40 20 250
DIESEL_1 DIESEL SIMPLE_CYCLE 100 50 2.0 20 0 1000
DIESEL_2 DIESEL SIMPLE_CYCLE 80 50 2.0 20 0 1100
System Parameters
Time Horizon 1 intervals (0.5h)
Interval Duration 30 minutes
Spinning Reserve (Up) 100 MW
Spinning Reserve (Down) 0 MW
Frequency Reserve 50 MW
Value of Lost Load 100000 NIS/MWh
Coal Priority Dispatched Last
Demand
Total Demand 950 MW